Reference Tables

Tables copied from the code and checked cell by cell, with the source and the date it was verified printed on the page. No paraphrased numbers, no "approximately", no rows quietly dropped because they were inconvenient.

A calculator answers one question with your numbers; a table lets you answer the next twenty without coming back. Most of the questions tradespeople actually search for are table-shaped — what size wire for this breaker, what span for this joist, how many conductors fit in this conduit — and the answers people find are usually a manufacturer blog quoting half a table, or a forum post quoting the wrong column of a full one.

These pages exist to fix that specific failure. Each one reproduces the table in full HTML — sortable by eye, readable on a phone, copyable into a job note — states the conditions the numbers are valid under, and names the section and edition it came from. Where a table has footnotes that change the answer, the footnotes are on the page rather than in a PDF nobody opens.

The tables

Wire Ampacity Chart — NEC Table 310.16

Allowable ampacity for copper and aluminium, 60/75/90°C columns, 14 AWG to 2000 kcmil, with the 240.4(D) caps and the ambient and bundle derating factors.

NFPA 70 (NEC) · amperes →

Breaker Size Chart — NEC 240.6(A) & 240.4(D)

Standard breaker sizes, the 125% continuous-load rule, the 240.4(B) next-size-up conditions, and the breaker and wire for water heaters, dryers, ranges, AC units and mini-splits.

NFPA 70 (NEC) · amperes →

Conduit Fill Chart — NEC Chapter 9

How many conductors fit in a raceway: the Table 1 fill percentages, the Table 4 fill area for EMT, IMC, rigid and PVC, and the Table 5 THHN conductor areas, with a working fill look-up.

NFPA 70 (NEC) · square inches →

Deck Joist Span Table — IRC 2021 R507.6

The full deck joist span chart — 2×6 to 2×12 by species, 12/16/24″ spacing and all four load cases — with the maximum-cantilever column keyed on back span.

IRC 2021 · feet-inches →

Deck Beam Span Chart — IRC 2021 R507.5(1)

Maximum span between posts for 1-, 2- and 3-ply 2×6 to 2×12 deck beams, three species groups at 40 psf live load — entered with the effective joist span.

IRC 2021 · feet-inches →

Rebar Size Chart — ASTM A615

Every standard bar, #3 to #18, with nominal diameter, cross-sectional area and weight per foot — plus a bar take-off and the weight formulas.

ASTM A615 · lb/ft →

Roof Pitch Chart — Degrees & Multiplier

Pitch from 1:12 to 12:12 with its angle, slope multiplier and hip and valley factor — and a converter for roof area and rafter length.

Geometry · degrees →

Seven tables are live so far. More are being built in the order the questions are actually asked, not alphabetically.

How to read a code table without getting burned

Every table in the IRC and the NEC is a set of answers to one very specific question, and the conditions live in the header, not the title. A table called "Allowable Ampacity" is not a universal statement about a wire; NEC Table 310.16 rates conductors in a raceway, cable or earth with not more than three current-carrying conductors at a 30°C ambient, and every one of those qualifiers can change the answer.

Four habits catch almost every misreading:

How the numbers on this site are checked

Every table page is built the same way. The table is fetched from a primary or near-primary reproduction of the code — the ICC or NFPA text, or a jurisdiction's own published code where the official site is behind a JavaScript reader — and where possible from two independent sources in different jurisdictions, then diffed cell by cell. Anywhere two sources disagree, the page says so and takes the conservative value rather than picking a favourite.

The verification date goes on the page, because code cycles move. It is printed rather than implied so you can judge how stale the page might be before you use it on work that has to pass an inspection.

What these pages are not: they are working references, not engineering. A table lookup is the right answer only while your situation is inside the table — inside the span, inside the load, inside the conditions in the header. Anything outside it, or anything carrying unusual loads, needs a designer or an engineer. Local amendments and the authority having jurisdiction always win.

More tables in progress

Next in the build order:

If you want the table that answers your question today and it is not here yet, the calculator hub already covers the arithmetic behind most of them — concrete volume, rebar and footings, deck framing spans, header sizing, stair geometry, drainage slope, material quantities, room load and conductor sizing.

For the worked reasoning rather than the lookup — the formula shown explicitly, an example you can check by hand, and the mistakes worth avoiding — the guides are the place to start, in particular the 100 amp subpanel wire size guide and the stair math guide.